Description of the projectArchitecture, Static, Mechanical, Electrical, Infrastructure , Project Management
Project name 

FOÇA DENİZ ÜS KOMUTANLIĞI Foça Tesisileri 2 Nci Kısım ( Land Structures)

Project

Administration/Company

Republic of Turkey Ministry of National DefenseConstruction, Real Estate and Security Investments Department

 

Location of the ProjectİzmirSonat Project No702

Project scope

Architect  
Static

Pier Project:

2  Scaffolding Projects with a Length of 90 m (Total 180 m) and a width of 12 m.

The Scaffolding Is Formed On Steel Pipe Piles With The Main Beam And Prefabricated Laying Elements.

The Deepest Water Loading at the Place where the Pier is Built is 22 m.

Capacity, Tonnage 3800 DWT, Loaded Displacement Tonnage 5000 Tons

 

The Dock Project:

In the Deep Parts, the Steel Pipe Is Formed On Piles With The Main Beam And Prefabricated Laying Elements.

The length of the dock is 658 m, Width is 20 m.

The Water Section of the Dock is 10 m.

There Is a 6268 M2 Screening Area Under the Dock. (total 14286 m3)

 

At the Point where the Dock is Connected to the Land, a Dock has been Created With In-Water Concrete.

The length of the dock is 658 m.

The Back of The Dock Filling Area Is 42146 M2 And The Total Filling Is 326619 Tons

The Dock Has Been Anchored in Various Sizes. (105958 Tons)

A Three-Channel Installation Channel with a Length of L=1360 m was Built on the Dock and Pier.

A Total of 17856 m3 of Excavation was Carried out for the Construction of the Dock.

 

Mendirek (Breakwater):

The Main Breakwater Length is 655 m, the Secondary Breakwater Length is 295 m (total 950 m)

The Total Amount of Filling is 655.195.000 m3 (1.703.507.000 tons)

The Full Width of the Base is max 170 m The Depth of the Water At the Deepest Place is 33 m

 
Mechanical

Dock and Pier:

Bilge Circuits (1490 m long)

Domestic Waste Circuits (1700 m long)

Fire Water Circuits (1500 m long)

Fuel Line Circuits (1490 m long)

Water Transmission Line (Purified Clean Water) (3246 m long)

 
Electricity

Scaffolding Cable Feeders (128.503 m long in Reinforced Concrete Channel)

Lighting Project

Fire Alarm System

Pier Field Distribution Panels

Pier Lighting 

4*800 Kva 440 V 50/60 Hz Converter Synchronization System

Rectifier 250 V DC

 

 
  • Employer:
    T.C. Milli Savunma Bakanlığı İnşaat Emlak Ve Güvenlik Yatırımlar Dairesi Başkanlığı
  • category:Structure
  • date: