project: Preparation of wastewater revision and stormwater implementation projects for Gülbahçe Neighborhood, Urla District, İzmir Province.
date: 16/06/2017Employer: İzmir Su ve Kanalizasyon İdaresi Genel Müdürlüğü (İZSU) / Izmir Water and Sewerage Administration General Directorate (İZSU).Details
project: Preparation of stream rehabilitation projects for the districts of Bornova, Buca, Çeşme, Çiğli, Gaziemir, Karabağlar, Konak, and Urla in İzmir Province for the year 2016.
date: 18/08/2016Employer: İzmir Su ve Kanalizasyon İdaresi Genel Müdürlüğü (İZSU) / Izmir Water and Sewerage Administration General Directorate (İZSU).Details
project: Preparation of implementation projects for stormwater pumping stations in the districts of Konak and Çiğli, İzmir Province.
date: 04/05/2016Employer: İzmir Su ve Kanalizasyon İdaresi Genel Müdürlüğü (İZSU) / Izmir Water and Sewerage Administration General Directorate (İZSU).Details
project: Preparation of repair and strengthening projects for the Çiğli Wastewater Pumping Station.
date: 11/10/2012Employer: İzmir Su ve Kanalizasyon İdaresi Genel Müdürlüğü (İZSU) / Izmir Water and Sewerage Administration General Directorate (İZSU).Details
project: Preparation of stream bed regulation projects for the Çeşmealtı-Iskele-Zeytinalanı section in Urla District, İzmir Province.
date: 19/04/2011Employer: İzmir Su ve Kanalizasyon İdaresi Genel Müdürlüğü (İZSU) / Izmir Water and Sewerage Administration General Directorate (İZSU).Details
project: Preparation of stream bed regulation projects for the Balıklıova-Gülbahçe-İçmeler-Özbek section in Urla District, İzmir Province.
date: 06/01/2012Employer: İzmir Su ve Kanalizasyon İdaresi Genel Müdürlüğü (İZSU) / Izmir Water and Sewerage Administration General Directorate (İZSU).Details