Preparation of stream bed regulation projects for L = 20,082 m, preparation of 1 planning report, and preparation of implementation projects for the first stage wastewater network with L = 4,537 m.
- Employer:
İzmir Su ve Kanalizasyon İdaresi Genel Müdürlüğü (İZSU) / Izmir Water and Sewerage Administration General Directorate (İZSU). - category:Infrastructure
- date:19/04/2011