As part of the Büyük Körfez Project, the task involves designing dewatering ponds, dewatered material storage areas, access roads for trucks and construction equipment, and transmission lines for filtrate water resulting from the dewatering process. This project focuses on dewatering dredged material, extracted from the İzmir Bay seabed, consisting of approximately 10-20% solid matter and 80-90% seawater, within the premises of the İzmir Çiğli Advanced Biological Wastewater Treatment Plant, with the goal of material recovery.
- Employer:
İzmir Su ve Kanalizasyon İdaresi Genel Müdürlüğü (İZSU) / The İzmir Water and Sewerage Administration General Directorate (İZSU) - category:Structure
- date:15/12/2017