Preparation of the implementation project for the discharge line that will allow the treated water from the wastewater treatment plant to be removed from the shoreline and discharged outside the protection zone.

  • Employer:
    İzmir Su ve Kanalizasyon İdaresi Genel Müdürlüğü (İZSU) / Izmir Water and Sewerage Administration General Directorate (İZSU).
  • category:Active Projects
  • date:14/07/2015